이건 소프트웨어 공학에서 말하는 계획단계에 있는 녀석이다.

요구사항을 정의 한 후 프로젝트르 어떻게 수행할 것인지 리스크는 어떻게 관리할 것인지에 대한 정보가 적혀 있으며 수행 과제에 대한 기본적인 정보도 포함하고 있다.

별첨도 있는데 귀찮아서 안 올린다..--;;


목차는 아래와 같다.

1.0 Project purpose 7
1.1 Introduction 7
1.2 Definitions 7
1.3 Person 7
1.4 Plan 7
1.5 Project Productions 7
1.6 References 9
1.7 Glossary 9
2.0 Project Overview 10
2.1 Project purpose, scope 10
2.2 Assumptions and Dependencies 10
2.3 Functional requirements 10
3.0 Project Organization 10
3.1 Organizational Structure 10
3.1.1. System Architecture Guidelines 11
3.1.2 Hardware/Software Structure 12
3.2 Process Modeling 12
3.2.1 Delvelopment Process 12
3.2.2 Process Model 12
3.3 Development Environment 14
4.0 Management Process 14
4.1 Priority 14
4.1.1 Priority Standard 14
4.1.2 Priority Metrix 15
4.2 Configuration Management 15
4.2.1 Configuration Identifying Category 16
4.2.2 Version Management 16
4.3 Quality Control 17
4.3.1 Purpose 17
4.3.2 Scope 17
4.3.3 Quality Control Plan 17
4.3.4 Quality Control Activity 18
4.4 Risk Control 18
4.4.1 Core substance 18
4.4.2 Risk generalization table 18
4.4.3 Risk Detail Analysis Content 19
4.4.3.1 Risk Type – Resource 19
4.4.3.2 Risk Type – Scope 19
4.4.3.3 Risk Type – Plan 20
4.4.3.4 Risk Type – Cost 20
4.4.3.5 Risk Type – Quality 21
4.4.4 Risk Monitoring Cycle Plan 21
5. Functional Process 21
5.1 Methodology Tool 21
5.2 Repeat Gradual Development Procedure 21
5.3 Project Tool and Technique 22
5.4 Each Step Propulsion Procedure 22
6. Scheduling 23
6.1 Task 23
6.2 Task Dependence Relation 23
6.3 Resouce consumption Plan 24
6.3.1 Project formation 24
6.3.2 Project Execute Duty 24
6.3.3 Business Conference 25
6.3.4 Communication 25
6.4 Budget Plan 26
6.4.1 Event List 26
6.4.2 FP 26
6.5 Scheduling Plan 27
7.0 Test Plan 27
8.0 Maintenance Plan 28
8.1 Maintenance Summary 28
8.2 Application Software Maintenance 29
9.0 Education Training Plan And Technique Transform Plan 29
9.1 Education Training Plan 29
9.1.1 Education Scope 29
9.1.2 Education Training Plan 30
9.2 Technique Transform Plan 30
9.2.1 Technique Transform Substance 30
9.2.2 Technique Transform method 31

계획을 세우고 나서는 마일스톤과 WBS를 작성하게 되는데 아래 우리 프로젝트에 대한 WBS를 작성한 것을 올려놓겠다.

Posted by 서오석
,